Fact sheet:
- Fully automated system with 2 chamber furnaces, water quenching bath, charging machine and supply and discharge lines with interim storage positions
- Expansion option for 2 additional ageing furnaces
- 4 independent, climate-controlled switchgears
- Fully automatic, three-dimensional charging with a charging machine controlled by a Siemens Simatic S7
- Process regulation with a DE-VX 4110 process controller for each furnace and temperature rise automatic controller for each heating zone
- Prosys/2 control system software and prover/2 automation software with batch-specific process documentation
- Electrical installation and commissioning on site
Responsible companies:
- Sales, mechanical design, energy footprint calculation and commissioning by Mioba Mitteldeutscher Industrie-Ofenbau GmbH
- Project planning, with process and sequence optimisation and commissioning by Demig Anlagentechnik GmbH
- Switch cabinet construction and installatino by Düster Elektrosteuerungsbau GmbH
- Process controllers and control system by Demig Prozessautomatisierung GmbH