Fact sheet:
- Complete exchange of the entire switchgear
- New wiring between the switch cabinet and terminal boxes
- New terminal strip design in the on-site terminal boxes
- Exchange of defective and dilapidated field device connection cable
- Use of the DE-VR 4115L regulation system with a higher level, state of the art prosys/2 control system and the prover/2 with modules 1-3